Full structure for the release checklist document produced by the release-checklist skill.


Present the release checklist as a series of checkboxes grouped by stage. The document can be kept in plans/<name>/release-checklist.md for tracking, or presented inline and used ephemerally.


These must all pass before deployment proceeds. Any failure here is a hard block.

Gather the task state with the bundled helper scripts (in _shared/scripts/) instead of hand-counting:

Terminal window
python3 _shared/scripts/plan-metrics.py plans/<name>/tasks.md
python3 _shared/scripts/plan-validate.py plans/<name>/tasks.md

plan-metrics.py returns the status totals (how many tasks are [~], [!], [-], etc.) and the per-phase completion. plan-validate.py flags more than one [~] task and any [-] skipped task missing its deferral note. Read these, then confirm the gates below — the P0 gate is priority-specific, so also check that every [P0] task is [x] directly. The output schema is in _shared/scripts/README.md.

## Stage 1: Pre-Release Gates
### Task Completion
- [ ] All P0 tasks are `[x]` complete (none in `[ ]`, `[~]`, or `[!]` state)
- [ ] All `[-]` skipped tasks are intentionally deferred (confirmed with plan owner)
- [ ] No tasks are `[~]` in progress
### Quality Gates
- [ ] `<package-manager> run typecheck` passes
- [ ] `<package-manager> run lint` passes
- [ ] `<package-manager> run test` passes (NN tests, NN% passing)
- [ ] `<package-manager> run build` passes (build output: <path>)
### PRD Success Criteria
- [ ] [Success criterion 1 from PRD] — verified by: <how>
- [ ] [Success criterion 2 from PRD] — verified by: <how>

Fill in the actual quality gate commands for the project. List every command — do not omit any.


Environment-specific setup that must be in place before deploying.

## Stage 2: Deployment Prerequisites
### Environment Variables
- [ ] All required environment variables are set in the deployment environment
- List each new variable introduced by this release: `VAR_NAME`<what it does>
### Database Migrations
- [ ] All pending migrations have been applied to the staging/production database
- List each migration file: `YYYY-MM-DD_<name>.sql`
### Feature Flags
- [ ] Feature flags required for this release are enabled in the target environment
- List each flag: `<flag_name>`<what it controls>
### External Services
- [ ] All third-party service credentials are configured and tested
- [ ] Any new external service dependencies have been provisioned

Omit sections that don’t apply to this release (e.g., no migrations → skip that section).


The ordered steps to execute the deployment. Be explicit — avoid “deploy the app” as a single step.

## Stage 3: Deployment Steps
- [ ] 1. Create a deployment tag: `git tag v<version> && git push --tags`
- [ ] 2. Run database migrations: `<migration command>`
- [ ] 3. Deploy application: `<deploy command or CI link>`
- [ ] 4. Confirm deployment is live: `<health check URL or command>`
- [ ] 5. Invalidate any CDN caches if applicable

The minimal set of user flows to verify in production immediately after deployment. Focus on P0 user stories from the PRD and existing critical paths.

## Stage 4: Smoke Tests
### New Features (from this release)
- [ ] [User can do X] — Steps: <brief steps> — Expected: <what to see>
- [ ] [User can do Y] — Steps: <brief steps> — Expected: <what to see>
### Existing Critical Paths (regression check)
- [ ] [Core flow 1] — Steps: <brief steps> — Expected: <what to see>
- [ ] [Core flow 2] — Steps: <brief steps> — Expected: <what to see>

Limit smoke tests to 5-10 flows. These should be runnable in under 15 minutes. For comprehensive regression testing, use the automated test suite.


What to do if the release causes a production incident. This section must be filled in before deploying — not after.

## Stage 5: Rollback Plan
**Decision criteria**: Roll back if:
- [ ] Error rate exceeds <threshold> within 30 minutes of deployment
- [ ] A P0 smoke test fails and cannot be fixed within <time limit>
- [ ] [Specific critical feature] is non-functional
**Rollback steps**:
1. Revert to previous deployment: `<revert command or previous image tag>`
2. Roll back database migrations (if any): `<down migration command>`
3. Notify stakeholders: <notification channel/process>
**Time to rollback**: Estimated < NN minutes

If the release cannot be rolled back (e.g., data migrations that cannot be reversed), document this explicitly and list what can be done instead (feature flag disable, hotfix process).


What to check in the first 30 minutes after a successful deployment.

## Stage 6: Post-Release Verification
- [ ] Error rate is at baseline (check: <error tracking tool>)
- [ ] Response times are at baseline (check: <monitoring tool>)
- [ ] No unusual spikes in logs (check: <log aggregator>)
- [ ] Key business metrics are nominal (check: <analytics tool>)
- [ ] Notify stakeholders that the release is live: <channel>

Every release checklist should start with:

# Release Checklist: <Plan Name> v<version>
**Date**: YYYY-MM-DD
**Plan**: plans/<name>/prd.md
**Go / No-Go**: [PENDING / GO / NO-GO]
**Deployed by**: [name or agent]
**Blocking items**: [none / list]

Update the Go/No-Go field after Stage 1 is complete. Only mark GO if all Stage 1 gates are checked.