dependency-upgrade

Dependency work is the change nobody scoped: no PRD, no design, yet it can rewrite the behavior of the whole application in one lockfile diff. The failure modes are characteristic — the “harmless” batch update that breaks one transitive edge, the major bump attempted without reading the migration guide, the audit fix that swaps one vulnerability for a compromised release published yesterday.

This skill turns upgrades into a staged, evidence-driven process: understand what each bump changes before applying it, apply risky bumps one at a time, hold every quality gate green throughout, and treat the registry itself as an untrusted input. The unit of progress is a verified bump, not an updated manifest.

Classify the work first, using the canonical routing table:

The request is…Is it this skill?Route to
Bumping versions of existing dependencies (patch → major), toolchains, or lockfile maintenance✅ YesThis skill
Resolving dependency-audit findings (CVEs) by upgrading✅ YesThis skill; security-review finds them, this skill applies the fix
Adopting a new dependency or a new capability of an upgraded one❌ Noidea-to-prd — that is new behavior with its own trade-offs
Removing a dependency by rewriting its usages⚠️ SplitThe removal decision is a design change; the mechanical rewrite may be refactor
App code was already broken before the upgrade❌ Nodebug-and-fix first — never upgrade on a red baseline

Bright line: an upgrade changes versions, plus the minimal code changes the new versions require. Improvements the new version merely enables are logged as Future Opportunities, never bundled into the upgrade diff.

  1. A scope — everything outdated, one dependency, a security finding, or a framework migration. If open-ended, produce the outdated report first and propose batches rather than updating blindly.
  2. A green baseline — run the project’s full quality-gate set (lint, typecheck, test, build) before changing anything. Every subsequent failure is then attributable to a bump. If the baseline is red, stop and surface it.
  1. Discover the ecosystem’s mechanics — manifest(s), lockfile, the exact outdated/audit/install commands for the package manager in use, and any workspace/monorepo structure (see ../idea-to-prd/references/codebase-discovery.md). Respect the project’s own tooling — if it uses bun, everything goes through bun, never a mixed npm call.
  2. Produce the outdated/audit report and classify each candidate by risk using references/upgrade-planning.md: semver distance (patch / minor / major), how load-bearing the package is, and whether it is a framework, a build tool, a type package, or a leaf utility.
  3. Batch by risk, not alphabetically: patch/minor bumps of leaf dependencies can travel together; every major bump, framework, or build-toolchain change gets its own stage — its own verification, its own revertable commit.
  4. Order the stages so prerequisites come first (a framework major before the plugins that follow it; the toolchain before the libraries compiled by it). Present the plan when the scope is large or any stage is high-risk.

For each stage, before changing any file:

  1. Read the changelog / release notes for every version being crossed — not just the target version. Breaking changes announce themselves in the versions in between.
  2. Read the migration guide for majors; note codemods the project provides and deprecations that become removals.
  3. Check the supply-chain signals in references/supply-chain.md: prefer versions published at least 7 days ago (fresh releases are where compromised packages live before being yanked); be suspicious of ownership changes, sudden maintainer swaps, and install scripts appearing where none existed.
  4. Map the blast radius — search the codebase for the APIs the changelog says changed. This turns “hope it works” into a concrete list of call sites to update.
  1. Bump via the package manager, never by hand-editing the lockfile. Manifest ranges stay pinned or bounded — no latest, no *, no unbounded >=.
  2. Make the required code changes the migration guide calls for — mechanically, minimally, following the project’s existing patterns. Run the official codemod when one exists.
  3. Run the full quality-gate set. Green → commit the stage (manifest + lockfile + required code changes together, nothing else). Red → fix forward only if the changelog explains the failure; otherwise revert the stage and record why in the plan.
  4. Inspect the lockfile diff before committing: only the expected packages moved, no surprise new transitive dependencies, no dependency silently switching registry or source URL. Lockfile discipline is a review artifact, not a formality.

Never stack a second risky stage on top of an unverified one — the whole value of staging is that a failure indicts exactly one bump.

  1. With all stages applied, run the full gate set once more, plus the ecosystem’s audit tool — confirm the upgrade actually resolved the findings it set out to resolve and introduced no new ones.
  2. Smoke-test the golden paths if the project has a runnable dev target — type checkers do not catch runtime behavior changes in untyped seams.
  3. Report:
## Dependency Upgrade Summary
**Scope**: [what was upgraded, N packages across M stages]
**Notable bumps**: [package X a.b.c → x.y.z (major): required changes and why]
**Deferred**: [bumps intentionally not taken, and why — e.g. released < 7 days ago, breaking change needs its own plan]
**Audit**: [findings resolved / remaining]
**Quality gates**: All passing ✅ after every stage

A major migration too large for this pass (framework rewrite, API rearchitecture) is scoped out honestly: route it to idea-to-prd so it gets a plan, rather than half-landing it inside an upgrade.

Never upgrade on a red baseline. A failing gate before the first bump makes every later failure unattributable. Green first, then bump.

One risky change per stage. Batch the boring, isolate the dangerous. When a stage fails, the cause list has exactly one entry.

The changelog is the spec. Reading release notes and migration guides before bumping is the difference between an upgrade and a gamble. Unread breaking changes don’t not exist.

Treat the registry as untrusted input. A version published yesterday, a new maintainer, a new install script — each is a reason to wait or investigate. Prefer versions ≥ 7 days old; most supply-chain compromises are caught and yanked within days.

The lockfile is part of the diff. Review it like code: unexpected transitive additions and source changes are findings, not noise. Hand-editing it is forbidden.

Upgrades are not feature work. Adopting shiny new APIs the bump enables is a separate, planned change. The upgrade diff contains versions plus the changes the versions require — nothing else.