Shared Conventions

The single source of truth for the lifecycle, routing, markers, labels, severities, priorities, effort sizes, and the plans/ layout used across every skill in this collection.

When a skill needs to refer to one of these conventions, it links here instead of restating the definition. If any skill’s wording disagrees with this file, this file wins — fix the skill, not this reference.


Every skill occupies a fixed position in one lifecycle. This diagram is canonical — skills reproduce fragments of it for local context, but this is the complete picture:

idea-to-prd → prd-to-design° → design-to-tasks → tasks-to-code ⇄ code-review → release-checklist → plan-retrospective
(what/why) (architecture) (task list) (build) (quality) (ship) (close)
  • ° prd-to-design is optional — warranted for non-trivial features, skipped for simple ones (design-to-tasks falls back to the PRD).
  • code-review is part of the pipeline, not an afterthought — run it per task or per phase during implementation, and always before release-checklist. Unresolved 🔴 Blocking findings in review.md are a release block.
  • Audit skillsui-design-audit, security-review, performance-review — run standalone, before or between pipelines. Each emits its findings as a PRD (plans/<audit-type>-<date>/prd.md), entering the pipeline directly at design-to-tasks; they do not pass through idea-to-prd.
  • Repair skillsdebug-and-fix (incorrect behavior) and refactor (structure-only change) — run standalone at any point and route work back into the pipeline when it outgrows them.
  • next-step is the orchestrator: it reads the plans/ state, reports where each plan is in this lifecycle, and routes any request to the right skill.

One table, used by every skill’s intake triage. Classify the work first; misrouting is how behavior changes ship without acceptance criteria.

The work is…Route to
A new feature, or any addition/change of behavioridea-to-prd, then the pipeline
Deciding the architecture for an existing PRDprd-to-design
Breaking a design or PRD into implementable workdesign-to-tasks
Implementing tasks from an approved task listtasks-to-code
Assessing a diff, PR, or changed file setcode-review
Incorrect behavior — something is brokendebug-and-fix
Restructuring code with behavior identicalrefactor
A systematic UI / design-system sweepui-design-audit
A whole-system security posture sweepsecurity-review
A whole-system performance posture sweepperformance-review
Verifying a plan is safe to shiprelease-checklist
Closing out a completed planplan-retrospective
Unsure what state the work is in or what comes nextnext-step

Bright lines: new or changed behavior always enters through idea-to-prd; incorrect behavior is always debug-and-fix; a structure-only change is always refactor. When a piece of work straddles two rows, split it — never smuggle one kind of change inside another.


Used as the leading checkbox on every task in tasks.md, and in any status report derived from it.

StatusMarkerMeaning
Not Started[ ]Work has not begun
In Progress[~]Actively being worked on
Completed[x]Done and verified — all acceptance criteria met
Blocked[!]Cannot proceed — the task note records the blocker
Skipped[-]Intentionally not doing — the task note records the reason

Rules:

  • Only the top-level task checkbox counts toward statistics — never the acceptance-criteria sub-checkboxes.
  • [!] and [-] always carry a note explaining the block or the reason for skipping.
  • [x] means verified: do not mark a task complete until every acceptance-criteria sub-checkbox is checked.

Priority answers “how important is this?” It is written as a bracketed tag on a task ([P0]) and as a bare label in a PRD (P0).

PriorityTagMeaning
P0[P0]Must-have — required to ship/launch
P1[P1]Should-have — expected, but can ship without it
P2[P2]Nice-to-have

PRD requirement language maps to priority: must → P0, should → P1, may → P2.


There is one severity scale across all skills. Severity answers “how bad is this finding?” and maps directly to priority, so findings can flow straight into a task list. This is the single canonical severity↔priority mapping.

SeverityMarkerPriorityUse when
Critical🔴[P0]Blocks shipping: a correctness or security bug, a broken acceptance criterion, or a broken/blocking user experience. Must be fixed before merge or release.
Major🟡[P1]A real problem that should be fixed this cycle but does not block the release.
Minor[P2]Polish: trivial style, a one-step deviation, a cosmetic inconsistency.

Code review applies this same scale using disposition names, because “blocks the merge” reads more naturally on a diff than “P0”:

Code-review termCanonical severityMarker
BlockingCritical🔴 Blocking
SuggestionMajor🟡 Suggestion
NitMinor⚪ Nit

Code review adds one marker that is not a severity: ✅ Praise, for calling out something done well. Praise carries no priority.

UI design audit uses the canonical names directly (🔴 Critical / 🟡 Major / ⚪ Minor) and maps them to [P0] / [P1] / [P2] when it emits its findings as a PRD.


Effort estimates the work to complete a task. It is written as a bracketed tag ([M]).

SizeTagRough timeTypical scope
Small[S]< 1 hrConfig change, simple utility, small fix
Medium[M]1–2 hrSingle endpoint, one component, one test suite
Large[L]2–4 hrMulti-file feature component, moderate complexity
Extra-large[XL]4–8 hrCross-cutting concern or major integration — break it down further before starting

Labels make every requirement traceable from PRD → tasks → retro. They are assigned in the PRD and referenced everywhere downstream.

LabelPrefixWhat it tags
Functional RequirementFR-NSomething the system must do
Non-Functional RequirementNFR-NA performance, security, accessibility, or reliability target
User StoryUS-NA user-facing story with acceptance criteria
Quality GateQG-NA lint / format / test / build / review check that must pass

N is a stable integer: assigned once and never renumbered, so references in tasks, commits, and conversations stay valid. During task decomposition, a risk that needs its own implementation work is tagged RISK-N.


All planning artifacts for one initiative live in a single dasherized folder under plans/. Active work stays in plans/<name>/; completed work moves to plans/archive/<name>/.

plans/
├── <active-feature>/ # Active work
│ ├── prd.md # idea-to-prd — source of truth for intent
│ ├── design.md # prd-to-design — architecture (optional; non-trivial features)
│ ├── adr/ # prd-to-design — architecture decision records (NNNN-*.md)
│ ├── tasks.md # design-to-tasks — derived task list, updated by tasks-to-code
│ ├── decisions.md # tasks-to-code — implementation decision log
│ ├── review.md # code-review — optional, multi-round review tracking
│ └── retro.md # plan-retrospective — added at close-out
└── archive/
└── <completed-feature>/ # Moved here by plan-retrospective after close-out
├── prd.md
├── tasks.md
├── decisions.md
└── retro.md
  • The folder name is lowercase, dasherized, and descriptive (api-rate-limiting, not feature1).
  • prd.md (and design.md, when present) is never modified after tasks are generated — it is the historical record of intent and structure. The task list is a derivative artifact. The one exception is the change protocols: a genuine requirements change goes through idea-to-prd (PRD update → design-to-tasks incremental re-task), and a genuine architecture change goes through prd-to-design (design/ADR update → design-to-tasks incremental re-task). Silent drift is never allowed; deliberate, recorded revision is.
  • design.md and adr/ are optional: prd-to-design adds them for non-trivial features, and design-to-tasks falls back to prd.md when they are absent.
  • Audit plans are named plans/<audit-type>-<date>/plans/ui-audit-2026-07-12/, plans/security-review-2026-07-12/, plans/performance-review-2026-07-12/ — each containing a prd.md of findings that feeds straight into design-to-tasks.
  • Not every file exists for every plan; each skill creates the ones it owns.

Two stdlib-only Python helpers in skills/_shared/scripts/ (documented in that directory’s README) read a tasks.md and report on it, so skills run the script and interpret the result instead of hand-counting markers:

  • plan-metrics.py — status totals, completion rate, per-phase breakdown (JSON)
  • plan-validate.py — structural lint: missing notes, dependency cycles, multiple in-progress tasks, requirement-coverage gaps (--prd plans/<name>/prd.md)

design-to-tasks validates with them after generating, tasks-to-code recomputes statistics with them after each task, and release-checklist / plan-retrospective use them for completion assessment and metrics. Prefer them over manual counting — they are the arbiter when a hand-maintained statistics table disagrees.